Hi All,
please i need tis information..how much will it cost to carry out a simulation study and how much does Eclipse(Modules: E100,E300,Schedule,FlowViz,VPi) or CMG(Modules:IMEX,GEM, WinProp) cost.
thanks all!!
DB
Hi All,
please i need tis information..how much will it cost to carry out a simulation study and how much does Eclipse(Modules: E100,E300,Schedule,FlowViz,VPi) or CMG(Modules:IMEX,GEM, WinProp) cost.
thanks all!!
DB
Figure $50-100K for the software licenses (depending on which features you need) and 1 month x $1K per day = $30K for simulation study
All very approximate, but in line with the amount of information you have furnished
How to resolve warnings in CMG GEM simulator run.
Stuck with a warning message-
Small value(s) (< 0.00001) for Sgc/Sorw/Sorg are being used in some Fracture
blocks. Recommend slightly larger values. Zeroes should not be used.
It depends on run time, complexity, number of cells, expertise and length if project. Normally in range of US$1K to US$ 3K per day. Now multiply with number of days that can be 20 days to 1 full year.
Bookmarks