376 Power Plant Optimization Guidelines
377 Layup for Cycling Units: Requirements* Issues* and Concerns
378 HEAT EXCHANGER TUBE SIDE MAINTENANCE – REPAIR vs. REPLACEMENT
379 Materials Handbook for Nuclear Plant Pressure Boundary Applications (2013)
380 Future Inspection of Overhead Transmission Lines
381 BWR Water Chemistry Guidelines -2000 Revision
382 IGCC Design and RAM Analysis for Near Zero Emissions
383 Impact of Air Emissions Controls on Coal Combustion Products
384 Guidelines for Performance-Based Contracts for Fossil Fueled Power Plants
385 Value of the Integrated Grid Utility Integrated Distributed Resource Deployment
386 Manual on Estimating Soil Properties for Foundation Design
387 Feasibility Study for an Integrated Gasification Combined Cycle Facility at a Texas Site
388 Guidelines for Upgrading Electrostatic Precipitator Performance Volume 1: Optimizing an Existing Electrostatic Precipitator
389 Cycle Chemistry Upsets During Operation: Cost and Benefit Considerations
390 Cycling* Startup* Shutdown* and Layup Fossil Plant Cycle Chemistry Guidelines for Operators and Chemists
391 The Volatility of Impurities in Water/Steam Cycles
392 Mechanical Seal Maintenance and Application Guide
393 Centrifugal and Positive Displacement Charging Pump Maintenance Guide
394 Tuning Approaches for DLN Combustor Performance and Reliability
395 Advanced Steam Labyrinth Seal Design Phase 1 Initial Concept Evaluation
396 Vanadium Redox Flow Batteries
397 Guide for rewinding and reconditioning medium voltage electric motors
398 Short-Term Wind Generation Forecasting Using Artificial Neural Networks
399 Program on technology innovation: Electricity use in electric sector
400 Procedure for seismic evalutaion and design of small bore piping
[link Point to another website Only the registered members can access]



Reply With Quote

Bookmarks