Looking for data and/or a case study of when tubing is typically installed in mid to high pressure gas wells.
Initially producing through casing, until well begins to liquid load. Next step for me is to install tubing, followed by artificial lift ( have typically went with plunger lift due to small amount of fluid, but considering a backside foam treatment.)
I know some install tubing during completion of well, trying to gather data on both initial tubing and installs and tubing installs after well begins to load with fluid.
Thanks