AOA,
weight of a heatexchanger is slightly more than lifting capacity of crane in that area. my client is of the
opinion that a detachable saddle should be designed for it, so as to lift the exchanger without saddle.
is it practible?if so then what about its design, i mean the same zick analysis or some else.
kindly guide if someone has idea
thanks