<

Results 1 to 3 of 3

Thread: productivity index

  1. productivity index

    is the productivity index (J) of the reservoir change with the effect of beaning up or down?

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2
    Karim Ramadan,

    Ideally, the Productivity Index (J), should be a constant at a given point in reservoir life. Under such conditions, it would be independent of the drawdown you exert on the well (by beaning up or down).

    Also, I think if you want to know what effect choke-changing would have on your well's production rate (as distinct from productivity index), you should conduct a multi-bean test to determine the inflow performance relationship.

    Happy to help

  4.    Sponsored Links



    -

  5. #3
    NO as long as your flowing bottom hole pressure remained above the saturation pressure.
    Yes otherwise....

Similar Threads

  1. Article: Productivity index in a horizontal well
    By UsmanHWU in forum Home Articles
    Replies: 0
    Last Post: 04-17-2014, 07:18 PM
  2. Productivity index in a horizontal well
    By UsmanHWU in forum Reservoir
    Replies: 0
    Last Post: 04-14-2014, 06:32 PM
  3. Is it the current estimation of Productivity index?
    By ibtisam01 in forum Reservoir
    Replies: 3
    Last Post: 11-30-2013, 12:48 PM
  4. Ïáíá ÇáÃäÊÇÌíÉ Productivity Index
    By Esam in forum ÇáÑßä ÇáÚÑÈí ááÈÊÑæá æÇáÊÚÏíä
    Replies: 0
    Last Post: 06-29-2012, 12:22 AM
  5. productivity index determination
    By amahaminer in forum Reservoir
    Replies: 9
    Last Post: 10-10-2010, 10:54 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40