    casing programme? OD selection?

    Dear all drilling engineer,

    i have question regarding casing programme and OD casing selection.
    currently im working at wellhead manufacture and everytime we start to do our work, i always see casing programme
    eg: 20" x 13 3/8" x 9 5/8" x 4 1/2"?
    since my work is in wellhead design itself, no need to care about casing programme as in wellhead manufacture,
    but i really curious about how to choose the right OD for casing programme.

    i try to find out the answer by reading a book and procedure about casing design.
    but so far that i found was talking about casing setting depth, load consideration for grade and poundage determination,
    still i couldnt find an answer for OD determination.

    when i started to think in every oil company it has their own procedure, does the procedure determine already the casing programme to be used,
    so that drilling engr just follow those code?

    or is there any calculation how to size conductor casing, surface casing, and even production tubing???????

    regards.

    yudhi
    Last edited by yudhi; 01-15-2013 at 06:00 AM.

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Join Date
    Oct 2008
    Location
    Yemen - Colombia - Mexico - Nigeria - Saudi Arabia
    Posts
    57

    Re: casing programme? OD selection?

    Hi,

    Check this out:

    [link Point to another website Only the registered members can access]
    If you need more information or is not clear, send me a message.

    DRILLING COMPANY MAN

  4.    Sponsored Links



    -

  •   

Similar Threads

  1. Casing Setting Depth Selection
    By aliali in forum Geology & Exploration
    Replies: 0
    Last Post: 05-26-2013, 08:19 PM
  2. Article: casing programme? OD selection?
    By yudhi in forum Home Articles
    Replies: 3
    Last Post: 01-29-2013, 11:54 AM
  3. Article: Casing selection in presence of CO2 and H2S
    By vocationman in forum Home Articles
    Replies: 0
    Last Post: 06-25-2012, 11:32 PM
  4. Casing selection in presence of CO2 and H2S
    By vocationman in forum Pipeline And Fluid Flow
    Replies: 0
    Last Post: 06-22-2012, 06:14 PM
  5. Replies: 1
    Last Post: 04-13-2012, 07:31 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •