Dear friends,
I have a doubt regarding the setting of the casing in the casing hanger after cementation is done.
After the casing lowering, cementation and WOC, the casing is hanged on the well-head via the casing hanger/slip.
Generally the procedure is that a pull equal to the weight of the casing is applied and the casing is set on that load. However, my confusion is: do we consider buoyancy for this. i.e. do we take the air weight of the casing or the buoyant weight to set the casing hanger.
Please guide.



Reply With Quote

Bookmarks