Hi I need some assistance regarding the NDT Requirements of Category D Lines. We are fabricating our pipe according to ASME B31.3 and the acceptance criteria is EN12517 (I do not have a copy). As far as I am aware the Category D Lines require visual inspection only. The client now after three years insists that it requires 5% RT (he specifies RT) and is trying to bring the job to a halt. We do 5% progressive NDT on All welders welding on site. Is anybody able to assist me? is this an actual requirement according to the code?