Process Plant
IChemE | 01/01/1998 | 115 pages
[link Point to another website Only the registered members can access]
Contents
Foreword to the second edition
Foreword to the first edition
Membership of the working party for the first edition
Acknowledgements
Introduction
Contracts, planning and administration
Engineering contracts
Types of contract
Quality Assurance Commissioning estimates
The project stage — early preparations
Preparation and composition of commissioning team •
On-site activities
Safety
Site liaison and communication
Performance testing
Operational training
Safety, health and environment
People
Safety training
Planning
Communications
Plant handover
Getting the plant ready for commissioning
Initial commissioning
Modifications
Quality
Assurance
Legislation
Postscript
Training Process operations
Maintenance
Laboratory and specialists
Training methods
Timing Mechanical completion and precommissioning
Mechanical completion
Precommissioning
Control systems
Timescale
System testing and installation
Calibration
Precommissioning of field instrumentation
Control system commissioning
Management
Personnel
Documentation
Process commissioning
Final checks
Typical sequence of commissioning
Quality control laboratory
Ancillary equipment
Storage — raw materials
Storage — intermediates and finished product•
Reaction system
Completion of commissioning
Performance and acceptance tests
Post commissioning documentation
Modifications
Records
Computer records
Audits/reviews
Reservation lists
Maintenance
Log sheets
Special cases
Small plant commissioning
Decommissioning
Projects carried out abroad
Bioprocess plants
Secondary pharmaceutical plant
Problem avoidance in commissioning
Typical problems
Underlying causes of problems
Glossary of terms
References Appendices 2.1–2.5 — Defining work and responsibility of construction and
commissioning by contractors and the client 3.1 — Reservation check-list 3.2 — `Chemicals
and hydrocarbons in’ check-list 3.3 — Safety assessment 5.1 — Typical check-list 5.2.1 —
Pressure vessels: inspection 5.2.2 — Equipment check-out schedule — packed columns
5.3.1 — Equipment check-out schedule — control panels 5.3.2 — Equipment check-out
schedule — orifice plates 5.3.3 — Equipment check-out schedule — relief valves 5.3.4 —
Piping systems test-sheet 5.4.1 — Typical electrical system check-list 5.4.2 — Equipment
check-out schedule — general electrical installation 6.1 — Loop check-list 6.2 — Sequence
check-list 6.3.1 — Instrument loop check-sheet 6.3.2 — Modification control form 7 —
Storage tank — final checks before commissioning Inde



Reply With Quote

Bookmarks