Results 1 to 7 of 7

Thread: [Help] How to control well production in ECLIPSE?

  1. [Help] How to control well production in ECLIPSE?

    Hi everybody !

    I'm learning ECLIPSE, and i have a question. How can I control well production and shut-in periods? For example, i have 2 wells, well 1 was produced at rate of 1000 stb/day, when well 1 went to a high WOR, it was Shut in and well 2 was opened.

    thanks a lot!

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Re: [Help] How to control well production in ECLIPSE?

    Not sure what your doubt is but I think that what you want to know is how to set the criteria to automatically shut-in wells based on maximum WOR, or minimum oil rate, or whatever limit you don't want to reach. This criteria can be set at a well level by using keyword WECON, or at a field/group level using GECON, or at a connection level with CECON, all of these keywords are introduced in the SCHEDULE section. Read the Eclipse manual for more details.

  4.    Sponsored Links



    -

  5. #3

    Re: [Help] How to control well production in ECLIPSE?

    Hi
    With regards to wells control in Eclipse, you can control them either by their respective production or injection phases ... (oil, water, liquid, gas) or pressures (BHP, THP) note than you need a lft curve if you choose to control them by THP .. if you have more than one condition than use GRUP .... in WCONPROD or WCONINJE ... you can also control them on a group level ... if you have several wells producing to the same facilities... if you want to prioritize well production compared to the other you can use a "GUIDERATE" formulas where you give credit to less GOR or WCUT producing wells ..you can also use a WELTARG keyword .. to shut a well as suggest previously you can use a WECON .... or I like more the ACTIONX coupled with WELLSHUT this last will shut yr wells following the condition that y suggested in ACTIONX keyword... it s up to you and how you want yr simulation to behave .... cheers

  6. #4

    Re: [Help] How to control well production in ECLIPSE?

    Hi
    With regards to wells control in Eclipse, you can control them either by their respective production or injection phases ... (oil, water, liquid, gas) or pressures (BHP, THP) note than you need a lft curve if you choose to control them by THP .. if you have more than one condition than use GRUP .... in WCONPROD or WCONINJE ... you can also control them on a group level ... if you have several wells producing to the same facilities... if you want to prioritize well production compared to the other you can use a "GUIDERATE" formulas where you give credit to less GOR or WCUT producing wells ..you can also use a WELTARG keyword .. to shut a well as suggest previously you can use a WECON .... or I like more the ACTIONX coupled with WELLSHUT this last will shut yr wells following the condition that y suggested in ACTIONX keyword... it s up to you and how you want yr simulation to behave .... cheers

  7. Re: [Help] How to control well production in ECLIPSE?

    As DAH7542 said, read the manual on the relevant keywords and, if you understand how reservoir engineering works, it should be obvious how you can control well production (WCONPROD) and injection rates, and how you can set cpntrol conditions, such as those based on economic considerations (WECON). There are various level you can set them too, but you need to keep in mind, if you have multiple conditions, which ones take precedence.

  8.    Spons.


  9. Re: [Help] How to control well production in ECLIPSE?

    Quote Originally Posted by JammyDodger View Post
    As DAH7542 said, read the manual on the relevant keywords and, if you understand how reservoir engineering works, it should be obvious how you can control well production (WCONPROD) and injection rates, and how you can set cpntrol conditions, such as those based on economic considerations (WECON). There are various level you can set them too, but you need to keep in mind, if you have multiple conditions, which ones take precedence.

    Please, @JammyDodger: How do you know or set which of the multiple constraints take precedence?

  10. #7

    Join Date
    Nov 2008
    Location
    Australia
    Posts
    508

    Re: [Help] How to control well production in ECLIPSE?

    Read the Technical Description manual, "Well controls and limits" section - best to understand how it works properly, rather than limping through knowing just enough to get a deck working

Similar Threads

  1. CO2 Corrosion Control in Oil and Gas Production
    By mabidal in forum Materials Science &Corrosion
    Replies: 10
    Last Post: 12-01-2014, 03:33 PM
  2. Article: Improving production through well control
    By pet_spec in forum Home Articles
    Replies: 0
    Last Post: 11-05-2012, 11:59 PM
  3. Improving production through well control
    By pet_spec in forum Reservoir
    Replies: 1
    Last Post: 10-25-2012, 03:24 PM
  4. Understanding Vacuum production & control Tutorial
    By sharmeen in forum Pipeline And Fluid Flow
    Replies: 0
    Last Post: 04-27-2009, 11:20 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40