First I must say that I'm very pleased with the utility of this site.
A little help please.. Is there another way to control the volume of produced water? I know Downhole oil–water separation mechanisms and polymers
Any book or paper share
tks
First I must say that I'm very pleased with the utility of this site.
A little help please.. Is there another way to control the volume of produced water? I know Downhole oil–water separation mechanisms and polymers
Any book or paper share
tks
If you are producing from different layers, run a PLT to detect from where the water is coming from and then perform a water shut off (chemical or mechanical, with a plug). Obviously, your decision will depend on which is the level to exclude and the completion of your well: if it is the lower, you have all the options, if it is above and you have other layers below producing from the same string you cannot put a plug but only have the chemical option. If you have a single selective tubing, simply close the SSD of the level you want to exclude.
Bookmarks