<

Results 1 to 3 of 3

Thread: History match

  1. #1

    History match

    Please be advise which parameters can I play to get good match in oil production rate and oil production total.
    Thank you in advance

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Re: History match

    Attached you'll find a summary table with advisable parameters for modification during history match. Focus on the "water cut column".

    PS: as suggested by Mattax and Dalton (SPE monograph on simulation), those parameters to be modified first during history match are the most uncertain, keeping the most well-known unchanged (whenever possible). I recommend you to make a list of the mot uncertain parameters (use engineering and geologic criteria) and try to get a saturation match by changing these only.
    Attached Files Attached Files

  4.    Sponsored Links



    -

  5. #3

    Re: History match

    Thank you so much.

Similar Threads

  1. PVT Match in PROSPER
    By ÇáÌäæÈí ÇáæÍÏæí in forum Oil And Gas Production
    Replies: 1
    Last Post: 01-11-2014, 12:31 AM
  2. Reservoir Static Pressure match
    By ÏÇæÏ ÍÇÒã in forum Reservoir
    Replies: 4
    Last Post: 01-17-2013, 03:31 PM
  3. History match question
    By vinomarky in forum Reservoir
    Replies: 2
    Last Post: 10-10-2011, 10:26 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40