I am a Piping design student. I came across this doubt while doing my project. Can anyone tell me how to do the stress analysis of a pipe or duct of 92 inch in diameter, connecting at the top of an 18 metre high quencher and running down to the inlet of a blower? What is the proper procedure for this?

Expecting a reply from someone.