Please My Petrel 2013 keeps losing the license each time I run it on my Windows 10, sometimes it runs without interruption, does anyone have the solution please share
Please My Petrel 2013 keeps losing the license each time I run it on my Windows 10, sometimes it runs without interruption, does anyone have the solution please share
Plesae can someone, anyone share petrel 2014 tutorials/manuals. well appreciated.
thanks
thank u soooo much
RR1 Making Maps ( no grid)
Step1. Gross MAP
The GrossThicknessMap is the thickness between 2 Surfaces (top-Bottom)
You can make it either substructing TopSurface from TopSurface (Zmin-Zmax) or make it from your Tops , by extrapolating values of zone thickness. I personally advise you first to build TopMap and BottomMap from make edit process and then create GrossThichnessMap. Since extrapolating Thickness of zone directly from tops could lead to abnormal results
Step2. Net Map (ratio)
Net is normally given as NTG curve at your logs or you can load them as tops value for each zone
One you make attribute for your tops or load NTG as user attribute you can extrapolate NTG as surface in MakeEdit surface process. I personally advise you to use moving average algo
Step3. Net Map (thickness)
once you have GrossMap you can in Calculator get NetMap by NetMap=GrossMap*NtgMap
Step4. Net Pay map
Net pay is something Pay or in another words laying above OWC contact (gas or oil) , so to get this you need to go to step 1, but calculate GrossRock above contact which is surface. To do this in Surface settings assign to Contact value all Z which are less that COntact value. Once you do it for Top and Bottom you repite Step 1 and you will get Bulk volume ABOVE contact.
Now you go to Step 4.
Enjoy
Hi Everyone, i see this thread is quite old. I am new to this forum tho, can anyone share me details on how to build a velocity model in petrel. I use 2014.2 currently and yes....i have gone thru all 18 pages of the thread, none refering to such tutorial. Good job everyone, especially Temr, God bless ya effort.
RR#3
Velocity model.
In simplicity siesmic is arrray which records time signal have been sent from source and time signal was red as reflected by probe.
So the physics is following - two media with different density will reflect back energy while wave will pass border of this two media .
So this border will give you time signal travel to and reflect from . So time is double.
Since we live in world where 3 dimention is lenth we need to transform the time to depth.
This can be done by several ways the easiest is to make interval model where you assign for each interval velocity
Let say you have 2 horizons
first one have T1 - time surface , Z1 - depth surface
Second have T2 - time surface , Z2 - depth surface
So you will need to build 2 interval model
Fo interval 0 to Z1 you velocity model will be described as
V1=(Z1/T1)*2000
For second interval from Z1 to Z2 your velocity model will be described as
V2=((Z2-Z1)/(T2-T1))*2000
And so on
You can use this rule with checkshots also
Regards
hello guys !
trying to use petrel for gas condensate reservoir modelling, need help or advice for fluid and reservoir simulation. im new with petrel so will appreciate any help or materials.
thanks temr
pls can someone shed some light on how to import a zmfvd file into petrel* im new with petrel and im trying to simulate a gas condensate resetvoir on petrel.Thanks
Dear Temr. Thanks for your kind help to community. Can you share Petrel step by step links again or share the files to my email muhammad.mech@gmail.com
Please help me out. Best wishes
Somebody to share lic file for Petrel 2014.1.
My expired at 01 March 2018.
Thanks.
Bookmarks