1. Except tank are small can be perform PWHT whole tank, otherwise local PWHT maybe deform the tank.
2. For API-650 nozzle to shell joint PWHT requirement, Vendor shall pre-fabrication this section, and doing PWHT, then erection at site before erection.
The method of PWHT not limited.





Reply With Quote

Bookmarks