well i m a mechanical engineer and involved in work static equipment designing-pressure vessel, heat xchanger, column, tower, i have to check the GA 7 fabrication drawings for these .can any body help me how to improve on this any reference book, document regarding these drawings, specific points to be considered while checking drawing





Reply With Quote

Bookmarks