<

Results 1 to 12 of 347

Thread: Eclipse step by step

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. what the keyword i have to use, if i wanna shut in well when the THP reach/under 200 psi? i use e300, i used to use WCONPROD, but after THP reach/under 200 psi, the software change to BHP as control pressure

    thanks

  2. #2

    Join Date
    Nov 2008
    Location
    Australia
    Posts
    508
    Can you paste your WCONPROD line here to check what your current control points and limits are set to?
    Last edited by vinomarky; 08-04-2010 at 07:05 AM.

  3.    Sponsored Links



    -

Similar Threads

  1. Replies: 11
    Last Post: 07-31-2016, 04:02 AM
  2. Eclipse Step by Step?
    By Zuper in forum Reservoir
    Replies: 2
    Last Post: 04-05-2012, 12:56 AM
  3. Step by step to calculate control valve Cv thorugh Intools
    By hswang2 in forum Instrumentation & Control
    Replies: 1
    Last Post: 11-28-2010, 09:37 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40