  1. FEED (Front End Engineering Design)

    Dear Sirs,

    Thanks for the members who are spending their valuable time to other technically growing peoples.

    Am having bit of an Experience in onshore and offshore process engineering (only detailed engineering)
    Nowadays am too interested to learn about FEED (front end engineering design)as a process engineer regarding to onshore/offshore oil and gas industries, what are the points and factors to be considered for FEED,
    How it the FEED should be started?
    How it to be proceeded to achieve the best design?
    What are the factors to be considered?
    Any books for guidance available?
    Any codes indicating those parameters?
    Or the FEED only coming purely behind the valuable years of experience?
    When choosing the technology, what are the factors to be considered?


    Sorry for this much of questions...kindly help me to grow in FEED ?
    Kindly post some articles in this forum or mail me dhnsekaran@gmail.com

    thanking you,
    kind regards,
    dhn.

  2. #2
    1- FEED comes after conceptual design
    2- To acheive a best deisgn you have to follow a strong guide line such as (WP,KBR,FW,Flour,JGC)
    3-It's a general question (plz specify)
    4-Surface production & operation,Petroluem & natural gas engineering
    5-API,PIP,ANSI,ISA

    Regards
    Emad Gebesy

    Worley Parsons Egypt

    emad.gebesy@worleyparsons.com

  3.    Sponsored Links



    -

  4. Thank you

  5. I think a typical FEED schedule would be great

  6. Check this link

    [link Point to another website Only the registered members can access]


  7.    Spons.


  8. Re: FEED (Front End Engineering Design)

    Thanks Daffodils. informative book.

    Regards,
    Maheen Ahmed

  9. #7
    Thanks for excellent Book !!!!!!!!!!!1

    refer this thread @@@@@@@@@@@22

    [link Point to another website Only the registered members can access]


  10. Actually the FEED is only a different matter to agrupate basic engineering and detailed engineering, the purpose is to agrupate all the activities that have the greatest impact in total installed cost and time to finish the project. The objective is that all important decisions about the project should be taken during the FEED phase in order that the cost and the schedule be practically ficed by the time this phase is completed
    The construction Industry Institute has a good amount of information about this , they developed a procedure to rate the scope of a FEED and if the obtained number is less that some number is almost sure that cost and developing time will be meet (they have qualified their procedure with a good amount of projects industrials and otherwise)

  11. #9
    What is the meaning of "agrupate"? What language is that?

  12. Maybe you would prefer reagrupate

  13. #11
    Great sharing thanks a lot

  14.    Spons.


  15. #12
    thanks

  •   

Similar Threads

  1. FEED & DEtail Engineering
    By ramesht906 in forum Petrochemical
    Replies: 2
    Last Post: 03-26-2014, 02:56 PM
  2. Replies: 0
    Last Post: 05-20-2013, 04:33 PM
  3. Replies: 6
    Last Post: 04-08-2013, 11:47 PM
  4. Replies: 0
    Last Post: 07-03-2011, 11:13 PM
  5. Front End Engineering
    By nomanfahmi in forum Petroleum Refining
    Replies: 0
    Last Post: 09-12-2009, 06:49 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •