<

  • .

  • expansion calculation

    dear all,

    i need to know when completion engineers did the completion proposal and specify the interval of perforation did he take in consideration the expantion of the tubing inside the hole due to tempreture change and gravity or not? and is this expanded length will affect on pay zone interval and mistargeted the pay zone specailly when the depth been higher??


    also pls can you give me sheet specifing the expantion coffient of pipes and tubes using in oilfield operation?


    TQ

    Quote Originally Posted by Chee Koh Peh View Post
    The casing is perforated not the tubing so as long as the perforating guns are not run on tubing, the tubing length has nothing to do with perforating depth. If perforating guns are run on tubing a gamma ray correlation is used to perforate on depth. The calculations you talk about have to do with tubing space out in the packer and landing the tubing hanger in the tubing head in the wellhead (so it is always in tension), and yes ALL completion engineers consider temperature/pressure effects etc...when calculating space out and tubing hanger tension etc...
    This article was originally published in forum thread: expansion calculation started by ÃÈæ ÇáÚÈÇÓ View original post
  • .

  • Recent Threads

    nicers

    Ses cdegs 20.0

    Thread Starter: nicers

    SES CDEGS v20
    Available for exchange for Powerfactory Digsilent 2025 or 2026

    Last Post By: raj151857 05-12-2026, 04:21 PM Go to last post
  • .

  • ..

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40