    dear all,

    i need to know when completion engineers did the completion proposal and specify the interval of perforation did he take in consideration the expantion of the tubing inside the hole due to tempreture change and gravity or not? and is this expanded length will affect on pay zone interval and mistargeted the pay zone specailly when the depth been higher??


    also pls can you give me sheet specifing the expantion coffient of pipes and tubes using in oilfield operation?


    TQ

    Quote Originally Posted by Chee Koh Peh View Post
    The casing is perforated not the tubing so as long as the perforating guns are not run on tubing, the tubing length has nothing to do with perforating depth. If perforating guns are run on tubing a gamma ray correlation is used to perforate on depth. The calculations you talk about have to do with tubing space out in the packer and landing the tubing hanger in the tubing head in the wellhead (so it is always in tension), and yes ALL completion engineers consider temperature/pressure effects etc...when calculating space out and tubing hanger tension etc...
    This article was originally published in forum thread: expansion calculation started by ÃÈæ ÇáÚÈÇÓ View original post
  • .

  • Recent Threads

    ProfessionalSS

    MicroMine2026

    Thread Starter: ProfessionalSS

    Hello
    MicroMine2025 is available now:

    pss_cheap@hotmail.com

    Last Post By: ProfessionalSS 05-16-2026, 03:21 PM Go to last post
  • .

  • ..

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40