Hi
I'm stuggling with understanding the "producing time" parameter required for Horner-plots and subsequent MBA analysis. How do I find the optimal modified producing time, or at least an acceptable interval for analysis?
I have tried to do analysis with different producing times and I get different kh and p* (from Horner plot) depending on what I use. The estimated average pressure (from MBH analysis), seems to stay the same, provided that the kh stays the same.



Recent Threads

vBulletin Message