    Hi all!
    I want to design a Gain Scheduled Level controller for a 3-ph. separator, say to control water oil level. For the low and high level range will have the same aggressive settings (higher gain and less integral time) while for the mid range I ll use more conservative settings. I thought of a combination of PID's and Selector or Override control.
    Any hints?
    Secondly, the Process Variable should be normalized between the level taps (low L and high H). I used an algebraic controller that receives the level signal from the tank and then subtracts the low level tap value (L) as a signal from a manualoutput controller and the divides it with the difference (H-L) which is provided by a second manual output controller. It works but is there anything simpler?

    Quote Originally Posted by nikosmiller View Post
    Found the answer to the first part of the question. From the ERROR key you can set the errors values (SP-PV) for which the controller settings should be changed. Then, the values for gain, Ti and Td corresponding to these errors should be added at the corresponding keys. Be carefull to add the error values in ascending order.
    Any ideas about normalizing input over a range?
    I m not sure how NORMRANGE key is used if anyone can help with that too.
    This article was originally published in forum thread: Controller schedulling in OLGA started by nikosmiller View original post
  • .

  • Recent Threads

    zkalattsz8243

    polygon bond

    Thread Starter: zkalattsz8243

    A claim reverts because a prerequisite step was skipped in the flow. Complete the steps in order and verify the claim before assuming it failed. Once

    Last Post By: zkalattsz8243 Today, 03:20 AM Go to last post
    arahelyandext9924

    anyswap cross chain cross over

    Thread Starter: arahelyandext9924

    A bot uses an outdated endpoint after a deployment change and every request starts failing silently. Update against the current technical documents so

    Last Post By: arahelyandext9924 Yesterday, 07:52 PM Go to last post
    aelizabettopz1238

    manta pacific bridge

    Thread Starter: aelizabettopz1238

    Funds sit idle after a transfer because the user is unsure what is safe to do. Follow the post bridge checklist to add the network, check balances, and

    Last Post By: aelizabettopz1238 Yesterday, 06:08 PM Go to last post
  • Recent Activity

    popov_al

    new standards

    Thread Starter: popov_al

    Last Post By: popov_al Yesterday, 06:14 PM Go to last post
  • .

  • ..

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40