<

Results 1 to 4 of 4

Thread: Pressure vessel to be intalled in Poland

  1. #1

    Pressure vessel to be intalled in Poland

    Can someone tell me how to do the right procedure for the first start up of a pressure vessel in Poland?
    The pressure vessel is manufactured according EN 13445 and certified by a Notified Body in accoding Module G: Conformity based on unit verification" of European Directive 2014/68/UE.

    Many thanks in advance

    AMinati

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Re: Pressure vessel to be intalled in Poland

    Provide more details. P&ID for instance. You should know pressure vessels law regulations in Poland for the beginning.

  4.    Sponsored Links



    -

  5. #3

    Re: Pressure vessel to be intalled in Poland

    Hello.
    Current?
    You must prepare all documentation acc. PED. Vessel must be marked whit CE mark. i work in Poland and i know something about this;]

  6. #4

    Re: Pressure vessel to be intalled in Poland

    I'm not sure but I think if the pressure vessel is certified by a Notified Body this means it's acc. to PED and it could be marked with CE mark.

Similar Threads

  1. Replies: 31
    Last Post: 08-04-2017, 07:00 PM
  2. Replies: 1
    Last Post: 10-22-2014, 11:39 PM
  3. Replies: 12
    Last Post: 02-05-2014, 06:11 PM
  4. CSA B51-09 Boiler, Pressure Vessel and Pressure Piping Code Need
    By cpchonburi in forum Mechanical Engineering
    Replies: 0
    Last Post: 08-05-2011, 01:14 AM
  5. Internal pressure and external pressure in pressure vessel
    By ekosusilo in forum Mechanical Engineering
    Replies: 15
    Last Post: 08-08-2010, 08:57 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40