Thread: Crude oil pumping station design

  1. #1

    Question Crude oil pumping station design

    Hi all....

    can some one help me in the sesigning of crude oil pumping station for a long distance cross country pipeline....

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. Hi,
    What kind of help do you need? What do you want to know?

  4.    Sponsored Links



    -

  5. #3
    Quote Originally Posted by thsoheiL View Post
    Hi,
    What kind of help do you need? What do you want to know?
    Hello sir,

    I wanted to know what are the main topics that must be covered when this project is taken.

  6. Dear friend,

    pumping heavy oil in long distance (etc 250 Km ) need pipeline 18'' and pumping pressure around 90 bars in order to have around 10 bars at the end point.

    Most of the times pumps are screwed pumps in series to reach 90-100 bars.
    There are a lot of sectionalizing valves along side from startiing point till the end, and a lot of measuring points. There is also computer online analysis for leakage check.

    Hope i help you

    the serviceman

  7. #5

    thank you sir.. can you also please throw some light on external corrosion monitoring

    Thank you so much sir..

    Can you please throw some light on external corrosion monitoring techniques in cross country pipelines and how its is linked to ECDA.. If you can help me in this iam very very thankful to you sir.........

  8.    Spons.


  9. #6
    Thank you so much sir..

    Can you please throw some light on external corrosion monitoring techniques in cross country pipelines and how its is linked to ECDA.. If you can help me in this iam very very thankful to you sir.........
    __________________

  10. #7

    thank you sir.. can you also please throw some light on external corrosion monitoring

    Quote Originally Posted by serviceman View Post
    Dear friend,

    pumping heavy oil in long distance (etc 250 Km ) need pipeline 18'' and pumping pressure around 90 bars in order to have around 10 bars at the end point.

    Most of the times pumps are screwed pumps in series to reach 90-100 bars.
    There are a lot of sectionalizing valves along side from startiing point till the end, and a lot of measuring points. There is also computer online analysis for leakage check.

    Hope i help you

    the serviceman
    ================================================== =====

    Thank you so much sir..

    Can you please throw some light on external corrosion monitoring techniques in cross country pipelines and how its is linked to ECDA.. If you can help me in this iam very very thankful to you sir.........
    __________________

  11. Quote Originally Posted by rajks View Post
    ================================================== =====

    Thank you so much sir..

    Can you please throw some light on external corrosion monitoring techniques in cross country pipelines and how its is linked to ECDA.. If you can help me in this iam very very thankful to you sir.........
    __________________

    Unfortunatelly I dont know anything about corrosion minitoring in crude oil pipelines. I have some expirience in natural gas pipelines where there is a cathothic protection with dc power that is monitored remotely with testing points in every section.
    When current increases they can cut the sections and find by local measurements the leakage to the ground.

    Sorry that i cant give any more help.

    The serviceman

  12. #9
    Quote Originally Posted by serviceman View Post
    Unfortunatelly I dont know anything about corrosion minitoring in crude oil pipelines. I have some expirience in natural gas pipelines where there is a cathothic protection with dc power that is monitored remotely with testing points in every section.
    When current increases they can cut the sections and find by local measurements the leakage to the ground.

    Sorry that i cant give any more help.

    The serviceman
    Sir can i have your mail id sir... My project work is on External corrosion monitoring in cross country pipelines sir.. If you can help me out with your valuable experience it will be of great use to me which can make my project work great sir..

    My mail id is mechkishoreraj.i@gmail.com

    Thanking you in advance....

Similar Threads

  1. Pumping station design 3RD EDITION
    By jlet in forum Mechanical Engineering
    Replies: 5
    Last Post: 02-09-2017, 09:33 PM
  2. Pumping station design 3RD EDITION
    By raj_01 in forum Mechanical Engineering
    Replies: 9
    Last Post: 10-14-2016, 03:03 PM
  3. Pumping station design to ASME B 31.4
    By vibintsankar in forum Pipeline And Fluid Flow
    Replies: 0
    Last Post: 11-15-2013, 09:01 AM
  4. Pumping Station Design
    By ali in forum Mechanical Engineering
    Replies: 16
    Last Post: 10-19-2010, 05:09 AM
  5. Pumping Station Design 3rd Edition
    By gepachir in forum Mechanical Engineering
    Replies: 2
    Last Post: 12-24-2008, 02:25 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40