hey good topic, but i wanted to ask which is related to epc in o&g, suppose i m qc Inspector piping and i have inspect the spool or hydrotest it, so who's gonna provide me the drawings and assign my tasks or duties
The CQAO will be responsible for the QA materials sampling and testing program. QA testing is provided for the verification of the adequacy and effectiveness of the contractor’s QC testing. QA testing is performed by the CQAO and is independent of and in addition to QC testing performed by contractors. QA testing may be performed on a pre-established schedule or as directed by the CQAO
4.2 Preparation of As-Built Drawings The contractor will be responsible for red-lining construction drawings in the field as preparation for as-built drawings. The as-built drawings will record approved actual field conditions upon completion of the work. The original design drawings will be marked up by the contractor as the project progresses to indicate as-built conditions. Where there was a change to a specified material, dimension, location, or other feature, the as-built drawing will indicate the work performed.