? Does anybody has following ppt from Suranaree University of Technology
(Introduction and Field Development Planning (1 hr
Production Facilities (1 hr). By Ass. Prof. KK
Wellhead Flow Control Equipment (2 hrs) Ass. Prof. KK
Fluid Separators. (4 hrs) Ass. Prof. KK
Crude Oil Treating System ( 3 hrs) Ass. Prof. KK
Water Treating System ( 3 hrs) Ass. Prof. KK
Safety and Environmental Equipment. ( 2 hrs) Ass. Prof. KK
Gas Treating System ( 4 hrs). By Dr. Akkaphan
Gas Processing Equipment. (4 hrs) Dr. Akkaphan
Pipe Line and Transportation System. (3hrs) Dr. Akkaphan
Oil & Gas Measurements (3 hrs) Dr. Akkaphan
Pumps and Compressors (4 hrs) Dr. Akkaphan
Kriangkrai Trisarn, 2005, “PETROLEUM SURFACE FACILITIES
PTTEP Training TEXTS ‘ PRODUCTION ENGINEERING,DRILLING PRACTICES’ 1996
Shell Group’s Course Training ‘ PRODUCTION TECHNIQUES



Reply With Quote

Bookmarks