Dear all,
I have a flow vs time table in excel which i wish to update the flow spec boundary condition in hysys.
I've attached a hysys file (inside the zip as the forum does not allow uploading of hsc file) and an excel file as a sample.
[link Point to another website Only the registered members can access]
[link Point to another website Only the registered members can access]
The table of datas are in column A and B.
I want to be able to import cell G4 (simulation time) from HYSYS and export cell I4 (flowrate) into the mass flowrate of stream 1. And the import and export of variable has to happen in real simulation time (not just the start).
Please advice. Thank you very much!



Reply With Quote

Bookmarks