Hi brothers,
When replacing a damaged section of an old (>20years) steel pipeline, can the pre-hydrostatic test of the replacement line pipe be waived for:
a) hydrocarbon pipeline B31.4 /B31.8
b) water pipeline
What documentation are required to support the waiver?
thanks a lot.



Reply With Quote

Bookmarks