Hi all, first time poster. I was seeing if anyone would be willing to look at the attached spreadsheet with any tips on a simple VBA macro that could get the same results without have to do a big 1x1 matrix table like I have currently.

[link Point to another website Only the registered members can access]


See More: Drilling Schedule Help