Hi colleague; I’m production engineer I need help ,so, I want to know how to calculate the volume of acid wash job? Needed to wash the perforations:
-this job is performed just for washing perforation to help wells to produce more and /or to improve injectivity in injection wells.
Knowing the depth of top and bottom of perforations, tubing guide, different diameter of well, casing tubing, type of rock(sand stone).
Thanks



Reply With Quote

Bookmarks