Hi colleague; I’m production engineer I need help ,so, I want to know how to calculate the volume of acid wash job? Needed to wash the perforations:
-this job is performed just for washing perforation to help wells to produce more and /or to improve injectivity in injection wells.
Knowing the depth of top and bottom of perforations, tubing guide, different diameter of well, casing tubing, type of rock(sand stone).
Thanks