<

Results 1 to 2 of 2

Thread: expantion coffient of pipes and tubes using in oilfield operation

  1. expantion coffient of pipes and tubes using in oilfield operation

    dear all,

    i need to know when completion engineers did the completion proposal and specify the interval of perforation did he take in consideration the expantion of the tubing inside the hole due to tempreture change and gravity or not? and is this expanded length will affect on pay zone interval and mistargeted the pay zone specailly when the depth been higher??


    also pls can you give me sheet specifing the expantion coffient of pipes and tubes using in oilfield operation?


    TQ
    Last edited by ÃÈæ ÇáÚÈÇÓ; 12-07-2011 at 04:07 PM.

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. for example if i propsed to perforate the interval from 1500m to 1505m, will the expansion factor mistarget my interval?

  4.    Sponsored Links



    -

Similar Threads

  1. Replies: 0
    Last Post: 01-21-2012, 10:29 AM
  2. Request: Nitrogen Termal expantion calculation
    By Cains in forum Engineering Spreadsheets & Presentations
    Replies: 2
    Last Post: 11-18-2010, 11:03 AM
  3. BS EN - Steel tubes and fittings
    By Achmad Nur Eddin in forum Pipeline And Fluid Flow
    Replies: 4
    Last Post: 10-21-2010, 08:23 PM
  4. need information about the cleaning of tubes with hot water
    By niconeuquen in forum Petroleum Refining
    Replies: 2
    Last Post: 01-31-2009, 08:19 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40