Hi All
can anyone tell me the procedure to calculate pseudo time and pseudo cumulative production (gas reservoir) in an excel sheet.
I want to use Flowing material balance method to calculate OGIP (original gas in place) for a dry gas reservoir.
thanks,
Malvika



Reply With Quote


Bookmarks