<

Results 1 to 7 of 7

Thread: Api 573

  1. #1

    Api 573

    Hi someone could help me, I need to know the distance from the Plant to the room control operation, someone told me that is in the API 573, could anyone help me.



    my email is: alberdisoria@yahoo.com - alberdisoria@gmail.com

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2
    573 is inspection of Fired Boilers and Heaters
    API RP 573 2nd Ed. Feb. 2003 - Inspection of Fired Boilers and Heaters.pdf

    [link Point to another website Only the registered members can access]
    I think what you need is 752
    If your control room is in a permanent building, use 752
    API RP 752 3rd Ed. Dec. 2009 - Management of Hazards Associated with Location of Process Plant Permanent Buildings.pdf

    [link Point to another website Only the registered members can access]
    I don't have 753 which is for temporary buildings

    Last edited by Nabilia; 01-30-2011 at 02:11 AM.

  4.    Sponsored Links



    -

  5. #3
    Thanks a lot....

  6. #4
    Here's the portable building one

    API RP 753 1st Ed. June 2007 - Management of Hazards Associated with Location of Process Plant Portable Buildings.pdf

    [link Point to another website Only the registered members can access]


  7. #5
    Tanks again....

  8.    Spons.


  9. #6
    thanks a lot
    ÈÓã Çááå ÇáÐ?* áÇ ?*ÖÑ ãÚ ÅÓãå ÔÆ Ýì ÇáÃÑÖ æáÇ Ý?* ÇáÓãÇÁ
    Muhammad Khurram

  10. Re: Api 573

    can anybody upload API 573 3rd Edition 2011?

  •   

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •