<

Results 1 to 1 of 1

Thread: PLT procedures NEDDED

  1. #1

    Join Date
    Dec 2007
    Location
    Novi Sad, Serbia
    Posts
    75

    Unhappy PLT procedures NEDDED

    Hi guys.. i need your help with this one.

    I need a PLT procedures (running,pulling,recording dynamic/static) for a gas-condensate wells... The problem is that i need to know which PLT tool for a gas-condensate well should be used depending on flow velocity and production rate. Is there any manual or guideline for it?

    Best regards
    Last edited by ivan_aljeburi; 09-29-2010 at 01:32 PM.

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many
     

Similar Threads

  1. Scaffolding procedures
    By curious in forum Civil & Structural Engineering
    Replies: 3
    Last Post: 10-23-2024, 06:15 PM
  2. J-A-C-O-B-S corporated procedures
    By veerin007 in forum Planning & Project Management
    Replies: 3
    Last Post: 07-01-2014, 04:56 PM
  3. QC and inspection procedures
    By AboudKassem in forum Mechanical Engineering
    Replies: 37
    Last Post: 08-27-2013, 10:50 PM
  4. JGC Engineering Procedures
    By sara58sara in forum Oil And Gas Process
    Replies: 1
    Last Post: 07-15-2011, 01:42 AM
  5. well test procedures
    By titi47000 in forum Oil And Gas Production
    Replies: 1
    Last Post: 05-14-2011, 11:24 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40