  1. Question OFFSHORE RIG CAPACITY DESIGN (hoiting, mud pump,rotary system )

    HI
    Is anyone have an idea or can share a handbook on how to calculate/design the required Rig Horspower and equipements for Drilling, Workover and Completion operations.

    thanks

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2
    You need API BULL D10. The paper is from 1973 but simple and straight forward. Some calculations you can perform with a computer software (easier).

  4.    Sponsored Links



    -

  5. #3
    You can refer:
    - Applied Drilling (SPE Textbook) - Chapter 1
    - Drilling Engineering - Neal Adams - Chapter 16
    I hope you can find what you need!
    Cheer!

Similar Threads

  1. Piping System Curve for one pump vs two pump in AFT Fathom
    By roman_maximo in forum Pipeline And Fluid Flow
    Replies: 0
    Last Post: 08-27-2013, 07:02 AM
  2. Pump and pump system glossary
    By Esam in forum Mechanical Engineering
    Replies: 15
    Last Post: 09-02-2011, 08:45 AM
  3. Offshore Condensate system design, Condensate design
    By Hiren in forum Oil And Gas Process
    Replies: 1
    Last Post: 07-23-2010, 08:25 PM
  4. expandable casing & rotary steerable system
    By ahmed abou zena in forum Drilling And Workover
    Replies: 0
    Last Post: 11-03-2009, 06:47 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40