dear guys,
does anyone know how to determine leak inventory in the process leak calculation?
backgroud:
the case is that i have choose four leak hose size(12in pipe with 4catagory hose size6.35mm,25mm,100mm,rupture(300mm)), i know,in the offshore fire and explosion analysis,the release inventory =isolated inventory in the segration+intial release inventory before ESD shut down-inventory blowout, now the operating pressure is 25bar,and the tempreture is 55 centigrade.during nomally operation condition,the max. flowrate in the pipe is 55.89kg/s, i choose the PHAST 6.53 to calculate the initial leak rate,‘leak model' for hole size of 6.35mm and 25mm,and long pipeline for 100mm,300mm,
but the inintial leak rate for large leak and rupure is very high,far bigger than 55.89kg/s, if i take the value ,the release inventory is so large,i think there's must be some problem,but i don't know why? i don't know whether my method to calculate method for release inventory is wrong, or i just need adjust the result if it's larger than the normally flowrate in the pipework?
pls. help me
thanks in advance.



Reply With Quote

Bookmarks