<

Results 1 to 6 of 6

Thread: Hard Dollar Process Construction Estimating Software

  1. #1

    Join Date
    Jul 2010
    Location
    Cairo, Egypt
    Posts
    15

    Hard Dollar Process Construction Estimating Software

    Here are the download links to this really great estimating package. It can use REED/RS MEANS data as well as RICHARDSON PROCESS INDUSTRIAL data packages. It also has a direct link to Primavera P6 scheduling.

    It will require a 'doctor' to inject some '********'......

    [link Point to another website Only the registered members can access]

    [link Point to another website Only the registered members can access]

    [link Point to another website Only the registered members can access]

    [link Point to another website Only the registered members can access]

    [link Point to another website Only the registered members can access]


  2. # ADS
    Spons Circuit
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many
     
  3. Please upload it again.

  4.    Sponsored Links



    -

  5. #3
    Well I think that this guy likes to joke hear.....................

  6. Where can i find the "********"

  7. #5

    Join Date
    Nov 2009
    Location
    All over EGPET
    Posts
    702
    Blog Entries
    1
    Pls provide the links.

  8.    Spons.


  9. #6

    Re: Hard Dollar Process Construction Estimating Software

    Don't waste your time. I made the mistake of downloading this from another site, posted by the same person. It is a software update from the vendor's website. Although it is a complete installation, it is not a "modified" program.

  •   

Similar Threads

  1. [MF] Estimating in Building Construction, 7th Edition 2010
    By Poisoner in forum Civil & Structural Engineering
    Replies: 6
    Last Post: 01-21-2019, 08:59 PM
  2. Process Plant Construction Cost Estimating Standards
    By inzenjer in forum Mechanical Engineering
    Replies: 5
    Last Post: 02-19-2018, 07:00 PM
  3. RIB Construction Suite - Estimating
    By Margarett in forum Oil And Gas Production
    Replies: 0
    Last Post: 05-31-2013, 09:07 PM
  4. Process Plant Construction Cost Estimating Standards
    By inzenjer in forum Petrochemical
    Replies: 1
    Last Post: 03-01-2012, 12:59 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •