<

Results 1 to 2 of 2

Thread: ETAP 16 issue

  1. ETAP 16 issue

    Why the Etap 16 software shows the message
    ((Selected zone s part of oop or connoted to multiple sources of supply and skipped in evaluation))
    during relay coordination in an interconnected system using Etap auto star evaluation?
    Thanks
    Attached Images Attached Images

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. Re: ETAP 16 issue

    [link Point to another website Only the registered members can access]


  4.    Sponsored Links



    -

  •   

Similar Threads

  1. [exciter saturation model]PSSE data over to ETAP issue
    By fgf in forum Electrical & Power Engineering
    Replies: 5
    Last Post: 01-26-2017, 04:05 AM
  2. etap 7.5 issue. Can not coordinate fuses
    By elojo_8 in forum Electrical & Power Engineering
    Replies: 0
    Last Post: 03-17-2014, 03:59 AM
  3. P11 & P22 Hardness Issue
    By ashfaqanwer in forum Materials Science &Corrosion
    Replies: 0
    Last Post: 09-08-2010, 08:46 PM
  4. Firewall issue
    By soni1 in forum Computer & Internet
    Replies: 0
    Last Post: 11-20-2009, 10:48 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •