Hi everyone,
i have a question and need help all of people who know about.
The question is about methods to solve (handle) wax deposition from a pipeline route to 3 phase Separator during pigging operation.
The problem mentions to wax deposition sending to Separator will fill in and block outlet lines of Oil & Water consequence Level High up and Shutdown system. is it correct?
So how to solve the wax capacity in the case. I would like to hear the Methodology & Experience in actual operation (i.e reference document source & real evidence), if any
i read some information such as[link Point to another website Only the registered members can access]
to Removal of wax deposits within a wellbore is accomplished by:
Cutting
Drilling
Chemical dissolution
Melting—the use of hot oil, hot water, or steam
However, it's general concept and it's not focus on the case which i mention above hence i really wanna know how to do in fact.
Appreciate your help!



Reply With Quote

Bookmarks