Thread: Weld toe to toe distance in above ground storage tank API 650

  1. Weld toe to toe distance in above ground storage tank API 650

    Dear experts,
    Please guide on solution of one problem in above ground storage tank API-650.
    Tank Data:
    dia 24m, height 15m bottom 1st shell course thickness 16mm , Rpad Thickness 16mm
    Problem:
    During construction site team rotated shell course and make manhole near vertical seam.
    The distance with vertical seam and pad is 5inch which is far less than code requirement of 10inch.
    If we perform PWHT of vertical seam requirement is still 6inch.
    What should be the best solution of the problem, please guide.

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. Re: Weld toe to toe distance in above ground storage tank API 650

    Have you considered using a thicker, smaller diameter repad?

  4.    Sponsored Links



    -

Similar Threads

  1. Above Ground Storage Tanks
    By 5161440 in forum Petroleum Refining
    Replies: 4
    Last Post: 10-30-2018, 12:04 AM
  2. Replies: 0
    Last Post: 12-20-2011, 10:04 AM
  3. Above Ground Storage Tank by Myer needed urgently!
    By raja687 in forum Mechanical Engineering
    Replies: 0
    Last Post: 07-18-2011, 10:09 AM
  4. above ground storage tank bottom protection
    By f.ghezeljeh in forum Materials Science &Corrosion
    Replies: 0
    Last Post: 02-17-2011, 09:17 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40