  1. i would also like to know how to prepare SCAL data in EXCEL.It wouldbe great Mr. Tamer if u can help me in this regard.your deep knowledge will certainly help me.I am new to SCAL .i have gone through capillary,wettability and relative perm a bit.how to convert these reports to useful outputs or conclusions
    thanx and regards
    jack

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #74
    Is it possible to import digitized structure contour map, wells and fault to Petrel to prepare static model? If so and how?
    Thanks

  4.    Sponsored Links



    -

  5. Quote Originally Posted by dipak_m View Post
    Dear Term,
    We are waiting waiting.....
    Gracias por su ayuda, he tenido la oportunidad de leer muchos de sus articulos que han sido de gran utilidad en mi trabajo. Por favor si alguien me puede ayudar en como preparar un proyecto para rehabilitar campos maduros. saludos. Marco Gallegos V.

  6. thank you very much, for me that's really help.

  7. #77

    Join Date
    Jan 2009
    Location
    ALA, KZ
    Posts
    436
    Dear All , thanks for warm words
    I would like to ask you all wait a little i need to finish my stuff ( end of the year )
    I preparing several goodies for you all ))
    one of them will be program in excel with open code which will prepare schedule section step by step
    Regardarding Petrel i will start separate thread once i will finish Eclipse chapters
    Kyrban ait kabil bolsin!!!!!

  8.    Spons.


  9. #78
    Thanks Term, hearing from your side. I thought you forget us. We can wait. No problem.

  10. #79

    compositional simulation

    Dear All

    I'm looking for some manulas or other expamples concerning compositonal simulation using Eclipse simulator (E300). Could you help me. I'm looking forward to your help.

  11. #80
    Look here

    [link Point to another website Only the registered members can access]

    Regards

    “Considering the many productive uses of petroleum, burning it for fuel is like burning a Picasso for heat.”
    —Big Oil Executive

  12. #81
    Thank you Shakespear. It will be very useful for me.

  13. #82

    Join Date
    Jan 2009
    Location
    ALA, KZ
    Posts
    436
    Schedule section - using Well_scheduler_light.xlsm
    Well_scheduler_light.xlsm is my own developed programm using VBA in excell
    It is quite simple and allows user easily build schedule section( for history section) using minimum data comparing to Schedule eclipse
    the supported keywords in light version are
    GRUPTREE
    DATES
    WELSPECS
    COMPDAT
    WPIMULT
    WCONHIST
    WEFAC
    Known limitations
    1. Metric system only

    Before you can use the programme
    DO NOT CHANGE NAME OF FILE Or Sheets NAMES OTHERWISE IT WILL NOT WORK !!!!!!!!!!!!!!!!!
    1. you should set you system environment to following
    go to control pannel on you windows system and choose regional and language options


    double click and choose exactly the same as shown in pictures below





    Now go to Excell and enable all macros

    It is in Russian but you can google the web and find "How enable macros in worksheet"
    So now you ready to Schedule

    Open program you will find following sheets


    Description of each sheet below

    Sheet MACRO


    Here you will find all main input for building you section
    All not needed cells are protected in order macro work correctly
    1.Settings

    Null - null value which used by Petrel when uploading trj sect
    THP - value for calculating maximum delta P
    Pressure a and Pressure b are pressure gradient coefficient
    Well max connections - maximum connections per well

    Simulation start and stop dates

    Grupe tree up to 20 supported


    Order in which you will upload properties in trj file

    Path to trj file
    name of history section
    Comments in sch file
    So lets open test project G_model


    Sort properties in the way as shown in sheet

    Now lets export trj file with the properties shown above



    Press ok
    now lets return to Spreadsheet Sheet EV
    Amust data to fill

    In evtype only perforation and plug supported
    No once we finish all to go to MACRO sheet and put path to exported trj file

    And press
    After macro will finish it run you will be return to DEBUG sheet were you can find all uniqe well with perforation available
    Go to CMD sheet

    Here you can find detail report on each connection of you well
    If you will press You get well potential ( the things we discuss in Chapter 7)
    On sheet NGC (No grid connections) detail result on all cells which penetrated by well trace bud has no connection to well

    Now let go to vol section


    this a amust input data there
    Once you fill all data press
    Macro will create schedule section in the directory where excel file located
    Analyze use enjoy

    link to chapter

    [link Point to another website Only the registered members can access] Link to file

    [link Point to another website Only the registered members can access]


  14. #83

    Join Date
    Jan 2009
    Location
    ALA, KZ
    Posts
    436
    Link to file

    [link Point to another website Only the registered members can access]


  15.    Spons.


  16. #84

    Join Date
    Jan 2009
    Location
    ALA, KZ
    Posts
    436
    So this ends Eclipse getting started
    Would like to wish you all read read and read
    Good luck

  •   

Similar Threads

  1. Replies: 11
    Last Post: 07-31-2016, 04:02 AM
  2. Eclipse Step by Step?
    By Zuper in forum Reservoir
    Replies: 2
    Last Post: 04-05-2012, 12:56 AM
  3. Step by step to calculate control valve Cv thorugh Intools
    By hswang2 in forum Instrumentation & Control
    Replies: 1
    Last Post: 11-28-2010, 09:37 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •