Thanks
Thanks
Dear experts,,
I have a problem running a new I just converted it from E100 to E300.
It has an unfamiliar error for me
Run stopping due to limit on bugs
5 Mbytes required
8745 characters used
2.6526 KB/active cell
Can anyone help me to solve this error,
It should be mentioned that this error is appeared after "--Bug @ Seed over-written in DWD, real pointer " when Procssing SOLUTION data.
I am waiting for you help...
tnx
catapam
I try to reply your question. Among the parameters suggested by you in rour question, you can only manipulate and change the Volume of aquifer by changing the radius. You can not change PI as the PI is the result of Fetcovich' anaysis. To change PI you need to change the Permeability of the aquifer.
hope this answer. Comments are appreciated
engineers
can eclipse give me K and DZ in a table for each well???
You can do this by using Petrel RE:
1. You'll be able to see Perm values under Models tab (Properties option), but you'll need to create DZ as a property, simply rigth click on Properties - Calculator - Name variable as DZ (or any name) - Click on Geometry and select "Heitht () Height of the current cell". DZ property has been created.
2. Creating Properties as a WellLog: go to Input tab, select Wells, right click and go to Make logs tab, select Perm and DZ and click on Make logs.
3. Exporting well logs (Perm and DZ): under Input tab, rigth click on Wells once again, select "Export all well logs in folder". It's done.
Dear Engineers,
I have been working with Eclipse and Petrel for over 3 years.
And its been a few dizzy weeks since my model had problem with running time..i'll just start with short story.
Im using high spec computer (i7, 8GB RAM)
This model contain 150.000 grids (this should be handled well by computer)
It has 25 wells, 12 years production, 8 SATNUM, 1 Equilibrium condition.
The problem is that i couldnt relly on running time, it differ from 1.5 - over 24 hours computing.
As in many of us do the manual history matching, ive been analys for any changes ive made would increase the run time, but i couldnt figure out how to make it faster (my expectation is it could be stable at 3 hours run)
As example is, the faster one is 1.5 hours, and i made small changes of ONE Oil-Water Relative Permeability, nothing else..and resulting over then 12 hours run time?
I also have tried to do some changes in TUNING Section..but it does not chop the time good enough. There is also possibilities i dont do it right at this section.
Im hoping a suggestion to minimize the Run Time, as i would sacrifice the proper result of convergence one.
Many thanks in advance..
Its the volume, its a usual things that we do not have knowledge of how big the aquifer size is..although you could provide this such info from Material Balance..
Aquifer size also means how big the energy of the drive mechanism.
While compressibility used to set as rule of thumb, and PI is balanced by amount of total liquid production by day.
CMIIW.
Can anyone help me ?
I got the base case model from the company (.data file with many includes file) but normally, I use office to create the simulation model.
Anyone know how to import from .data to office ?
Thanks
Dear All
Anyone have any idea if I want to simulate natural flow simulation. What's the keyword that I have to use
I cant find any description in the manual. Please any can help me?
Thanks