<

Results 1 to 10 of 10

Thread: Workover

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    So it is an oilwell producing by gas lift.
    Now, if you want to change valves you can do it on slickline - no need to kill the well.
    If you want to pull tubing, just give this well some crude oil to drink and it will be quite as fish.
    If the crude get lost into formation and the well comes into you, just pump some more crude into it (or produced water). No formation damage will happen since there are already formation fluids.
    Snubbing is another alternative.
    Last edited by Yengineer; 08-30-2011 at 11:50 PM.

Similar Threads

  1. Workover Office ----- download
    By Luchito in forum Drilling And Workover
    Replies: 0
    Last Post: 07-04-2013, 01:19 AM
  2. Well workover at offshiore field
    By igor2012 in forum Drilling And Workover
    Replies: 0
    Last Post: 09-10-2012, 10:08 AM
  3. Workover processing
    By MrDung in forum Drilling And Workover
    Replies: 0
    Last Post: 07-07-2011, 11:18 AM
  4. Workover.................?
    By kareemadel in forum Drilling And Workover
    Replies: 9
    Last Post: 10-22-2008, 02:03 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40