<

Results 1 to 12 of 14

Thread: How come ?!!

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #3
    Quote Originally Posted by ELgharib View Post
    How is your completion? Open hole or cased hole? Selectivity? Can you isolate one reservoir and measure the flowrate?
    This well was side tracked from the original well .. but then it was abandoned because they couldn't reenter it ..
    so now am talking about the side tracked well ..it's cased in reservoir 2 .. but open hole in reservoir 1 with the highest production, ( the original well was completed in the same way as well )
    yes they isolated one of the reservoir so they can know the split of the oil production .. and this was the result ..
    the reservoir with the worst characteristics and watered out.. is the one with highest production
    Last edited by jikzo; 07-05-2011 at 07:24 AM.

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40