Quote Originally Posted by Kebian View Post
Hi All , i urgently need help wit some electrical design. its a 2-storey containing 7 apartments. one main panel board serving the seven consumer units, a backup generator set for the whole building, manual changeover switch. wat wiring design can ensure the meter does not read when you change supply to the generator, that is i do not want to do the double wiring bcos of cost.
Pls gurus, help, the proj is ongoing

regards,
kebian
Install the energy meter on incoming side of the normal supply line.