In a pipeline design project that does not span more than 2km, is it necessary to have an alignment drawing? I think a GA drawing should suffice.
In a pipeline design project that does not span more than 2km, is it necessary to have an alignment drawing? I think a GA drawing should suffice.
Bookmarks