Hi All
can anyone tell me the procedure to calculate pseudo time and pseudo cumulative production (gas reservoir) in an excel sheet.

I want to use Flowing material balance method to calculate OGIP (original gas in place) for a dry gas reservoir.

thanks,
Malvika