<

Tab Content
No Recent Activity
About MEHTA

Basic Information

Statistics


Total Posts
Total Posts
20
Posts Per Day
0.00
Last Post
WPS require for SA 516 70 to SA 276 J-groove welding 07-04-2013 08:37 AM
Projects
General Information
Last Activity
Yesterday 09:48 PM
Join Date
03-02-2011
Referrals
1
View MEHTA's Blog

Recent Entries

SME SEC-VIII,Div.1 1-7 a & its apllication

by MEHTA on 07-08-2015 at 05:28 PM
My query is for below written condition:-
Nozzle connection comes under large opening as per UG-36 (b) (1) .
Hence it should be check as per asme APP 1-7.
Here query is that if Connection does not meet requirement of 1-7-b-1-a & 1-7-b-1-b .
& Rn/R ration exceed 0.7. Then we have to perform calculation as per U-2 (g) or calculation should be limited to 1-7(a).v
Categories
Uncategorized

titanium a technical guide book required

by MEHTA on 12-30-2013 at 09:08 AM
Does any body has a book titanium a technical guide please share
Categories
Uncategorized

Lug Support design for horizontal euipment

by MEHTA on 10-04-2013 at 08:35 AM
Does any one have lug support design for heat exchnager supported on 4 lugs instead of saddle
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40