  • Behind Pipe Potential & Reserves

    Dear Gentlemen,

    I receintly started working on a mature field. The reservoir type is sandstone. Multy stack hydraulically sepreated by shales. The number of vertical zones/reservoir pools is approx 40. The reservoir dvelopment strategy is simple - produce/deplete the lowest possible reservoir with the sequential recompletion to the upper zones. Sometimes there are comingled prod cases. Apart of the vertical compartmentalisation, the field is also compartmentalised areally - highly faulted.

    The matter is as following: I need to evaluate the behind pipe potential & reserves for the entire field, and for about 150 active wells. I have already prepared the table with the remaining net pays by well / by compartment (vert. areal). I need to integrate the remaining net pays with the current production data by well.

    Does anyone have suggestions?

    I started working with DCA i.e. identifing the decline rate per well in such a way apply same decline rate for the period after well is worked over and new perforations added. I say DR per well, because in the case of comingled cases there is no data e.g. PLT to allocate the production.

    Let us have some brain storming, and see what we can approach.
    I will appreciate if you'd reply to my mail directly as I can not access forum at office.

    m.nurov@gmail.com
    This article was originally published in forum thread: Behind Pipe Potential & Reserves started by Maratzhan View original post
  • .

  • Recent Threads

    zkalattsz8243

    polygon bond

    Thread Starter: zkalattsz8243

    A claim reverts because a prerequisite step was skipped in the flow. Complete the steps in order and verify the claim before assuming it failed. Once

    Last Post By: zkalattsz8243 07-08-2026, 03:20 AM Go to last post
    arahelyandext9924

    anyswap cross chain cross over

    Thread Starter: arahelyandext9924

    A bot uses an outdated endpoint after a deployment change and every request starts failing silently. Update against the current technical documents so

    Last Post By: arahelyandext9924 07-07-2026, 07:52 PM Go to last post
    aelizabettopz1238

    manta pacific bridge

    Thread Starter: aelizabettopz1238

    Funds sit idle after a transfer because the user is unsure what is safe to do. Follow the post bridge checklist to add the network, check balances, and

    Last Post By: aelizabettopz1238 07-07-2026, 06:08 PM Go to last post
  • Recent Activity

    raj151857

    Cdegs 20

    Thread Starter: raj151857

    Last Post By: ahvaz Today, 01:00 PM Go to last post
  • .

  • ..

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40