  • Well Control Help

    Well was displaced with 15.2ppg brine prior to set 7” tie back packer was set @ 4510 & new TOL 4497m.

    RIH TCP guns & perforate overbalanced with 15.2ppg brine (expected pressure was 14.9ppg formation pressure) f/5217.5-5233.5 & 5256.5-5265m.

    Observe 200psi on choke manifold, shut well & observe pressure increase to 560psi. SICP-295 & SIDP 221psi. Before shutting well SICP-335 & SIDP-647.

    Circulate #1 well with drillers method OBSERVED INITIAL SICP 304 PSI & SIDPP 574 PSI, observe 14.08% of gas at surface. Stop circulation & monitor well. SICP 326psi & SIDP 300psi. Bleed of ¾ bbl through choke & obs SICP-250 & SIDP 237psi. Shut well & monitor well, SICP–400psi & SIDP–376psi.

    Begin #2 circulation with 15.2ppg brine through down the string & up the choke. SIDPP- 700psi and SICP-367psi. Max gas observed 11.85%. Last recorded pressures Drill pipe 685psi casing pressure 317 psi. Shut in well on choke and observed for pressure buil up. SIDPP-532psi, SICP-518psi. FIRST Bleed off 0.75bbls , DP -211PSI, CP-205PSI. Shut in well on choke and observed for pressure buil up. SIDPP-347psi, SICP-348psi. SECOND Bleed off 0.75bbls
    sicp-105psi, sidpp-107psi.

    Shut well, Pressure increased to sicp-180psi, sidpp-180psi. Bleed off 3/4bl. sicp-41psi, sidpp-41psi. 2100-2200 shut in well to observe pressure build up. sicp-64psi, sidpp-55psi. bled off 1 1/4bbl. sicp-12psi, sidpp-25psi. Shut in well to observe pressure build up. sicp-27psi. sidpp-27psi.

    #3rd circulation of driller’s method. initial pressure: sicp-150psi, sidpp-476psi. max gas observed 22.2% after bottoms up. further circulation is in progress.


    To balance current well control situation required brine weight is 15.5ppg & overbalance is 15.6ppg. Chemicals to prepare higher ppg brines are not available & also well cannot be displaced with available SOBM mud as the 7” tie back packer is not compatible with SOBM mud.


    Do any one have any solution for this situation
    This article was originally published in forum thread: Well Control Help started by himansh1990 View original post
  • .

  • Recent Threads

    hopeful

    Etap 24.0.3

    Thread Starter: hopeful

    Hello, electrical engineers.

    Does anyone have the "real" solution for Etap 24.0.3?

    Last Post By: hopeful 07-23-2026, 02:42 PM Go to last post
    georgecis

    ISO 52016 Request

    Thread Starter: georgecis

    Hi! Could anyone please help with:


    ISO 52016-1:2017 Energy performance of buildings — Energy needs for heating and cooling, internal

    Last Post By: georgecis 07-21-2026, 02:30 PM Go to last post
    lhipkramm

    Softwares available

    Thread Starter: lhipkramm

    Softwares for exchange or sell

    Archelios 2024
    Aspen One Liner 14.7
    CDEGS V17
    CYMCAP V9.1
    Cyme 9.0
    CYMGRD 8.0

    Last Post By: lhipkramm 07-19-2026, 03:14 PM Go to last post
  • Recent Activity

    Freeman

    Iso 9000

    Thread Starter: Freeman

    Last Post By: ra_junaidi Yesterday, 04:31 AM Go to last post
  • .

  • ..

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40