    Article: Engineering Manhour Estimate

    You can view the page at

    [This link Point to another website Only registered and activated users can see links.]


  • # ADS
    Spons Circuit advertisement
    Join Date
    Always
    Posts
    Many
     
  • #2

    Join Date
    Oct 2010
    Posts
    6
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Dear gusgon, could you send me a copy of that PDVSA manual? I have no trouble with spanish.
    Thanks a lot.

  •    Sponsored Links



    -

  • #3

    Join Date
    Feb 2009
    Posts
    50
    Thanks
    0
    Thanked 19 Times in 5 Posts
    Dear sara58sara, I agree with above answers but if you are interested in a specific case, please provide more details and perhaps I could help you (i.e. project characteristics, type of engineering to be done -basic or detailed?, country).
    By the way, you may find interesting the following thread:

    [This link Point to another website Only registered and activated users can see links.] There are also some books to estimate man hours of certain disciplines like "ESTIMATOR'S PIPING MAN-HOUR MANUAL" or "ESTIMATOR'S ELECTRICAL MAN-HOUR MANUAL".
    At the end of the day, the better approach to estimate the engineering work depends on the amount of information you have regarding the job. If you share some information, perhaps I could give you some specific advices.
    Regards and good luck.


  • #4

    Join Date
    Jun 2008
    Posts
    155
    Thanks
    190
    Thanked 182 Times in 43 Posts
    Quote Originally Posted by JOEBOULDER

    [This link Point to another website Only registered and activated users can see links.]

    gusgon: which is that Pdvsa Manual? Regards
    Guias de Gerencia de Proyectos de Inversion de Capital (GGPIC)

    Es de la vieja PDVSA. Si no lo tienes lo pongo a disposición.

  • #5

    Join Date
    May 2011
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Depends on scope of work and the phase you are intending to calculate man-hours (i.e. FEED, EPC).

    Experience cannot be ignored here and there are other factors e.g. being EPC globally recognised company..you may need to refer company standards from which you are not well familiarized.

    There are excel based sheets available and can be used but again one cannot nullify your experience with regard to scope of work and material to be produced.

    e.g. I have to prepare Engineering HAZID procedure..I will consider preparation man-hours, comments (if given) by company after review incoporation and then re-issue for approval. approx 18 hrs or less as I am well familiarized with the study methodology and have loads of sample docs prepared during previous projects.

    hope this helps!(:

  • #6

    Join Date
    Nov 2009
    Location
    New Delhi
    Posts
    24
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Dear gusgon,
    I would be grateful if u could send me a copy of that PDVSA manual? giving manhourestimation
    thanks
    Suresh 750@gmail.com

  • #7

    Join Date
    Feb 2009
    Posts
    26
    Thanks
    0
    Thanked 0 Times in 0 Posts

    amigo podrias enviarme una copia a ami correo de Guias de Gerencia de Proyectos de In

    amigo podrias mandarme Guias de Gerencia de Proyectos de Inversion de Capital mi correo es ilnovo@hotmail.com gracias de antemano

  • #8

    Join Date
    Feb 2011
    Posts
    25
    Thanks
    0
    Thanked 14 Times in 4 Posts
    Dear gusgon,
    I would be grateful if u could send me a copy of that PDVSA manual? giving manhourestimation
    thanks
    Jose josediazf141@yahoo.es

  • #9

    Join Date
    Feb 2011
    Posts
    25
    Thanks
    0
    Thanked 14 Times in 4 Posts
    Dear gusgon, could you send me a copy of that PDVSA manual? I have no trouble with spanish.
    Thanks a lot
    josediazf141@yahoo.es

  • #10

    Join Date
    Feb 2009
    Posts
    377
    Thanks
    2
    Thanked 40 Times in 26 Posts
    gusgon has disappeared!!!!!!!!!!!!!!!!!!!!!!!!!!

  • #11

    Join Date
    Jun 2008
    Posts
    155
    Thanks
    190
    Thanked 182 Times in 43 Posts
    I´ll posted tonigh. Sorry I haven realized this thread.
    Lo pongo esta noche. Disculpen no habia estado pendiente de este post

  • #12

    Join Date
    Jun 2008
    Posts
    155
    Thanks
    190
    Thanked 182 Times in 43 Posts
    Aqui esta el libro
    Guias de Gerencia de Proyectos de Inversion de Capital (GGPIC) - PDVSA


    [This link Point to another website Only registered and activated users can see links.]


    •   

    Similar Threads

    1. Engineering Manhour Estimate
      By sara58sara in forum Planning & Project Management
      Replies: 56
      Last Post: 05-16-2017, 11:24 AM
    2. Replies: 25
      Last Post: 08-26-2014, 07:16 PM
    3. Replies: 0
      Last Post: 04-17-2014, 08:02 PM
    4. Electrical/Instrumation estimating manhour
      By cytech in forum Planning & Project Management
      Replies: 0
      Last Post: 06-09-2013, 02:00 PM
    5. Article: Estimate drainage Area for vertical well
      By mohamed_B in forum Home Articles
      Replies: 2
      Last Post: 01-10-2012, 09:07 PM

    Tags for this Thread

    Bookmarks

    Posting Permissions

    • You may not post new threads
    • You may not post replies
    • You may not post attachments
    • You may not edit your posts
    •